Raising the height of a manufacturing silo whilst the factory worked below 24 hours a day. Works included steelwork and cladding.
   
1. Existing Silo to be raised by 4 metres.   2. Scaffold with removeable temporary roof.   3. Romove scaffold roof.
   
4. Remove existing steel structure   5. Lift structure into place.   6. Re-fix temporary scaffold roof to clad
and roof